2016 June Microsoft Official New Released 70-499 Q&As in GreatExam.com!
100% Free Download! 100% Pass Guaranteed!
After purchasing the dumps for the 70-499 Exam from GreatExam, I had no doubt that I’d easily pass the exam. Bundle of thanks to GreatExam for helping me pass the exam without any troubles.
Following questions and answers are all new published by Microsoft Official Exam Center: (The full version is in the end of the article!!!)
QUESTION 91
You are the application architect on your team.
You have a straightforward architecture consisting of an ASP.NET MVC Web Application that depends on a Class Library, which contains the Business Logic.
The Business Logic uses another Class Library that contains the Data Access code.
No code in the UI should ever use the Data Access library directly.
You need to enforce this architectural requirement.
Which Visual Studio tool should you use?
A. Layer Diagram
B. Directed Graph Document
C. Dependency Graph
D. UML Component Diagram
Answer: A
Explanation:
http://msdn.microsoft.com/en-us/library/dd409462.aspx
QUESTION 92
Hotspot Question
You are the lead tester for Contoso, Ltd.
The company is using Microsoft Visual Studio to develop a new software product.
Management wants to test the product as it is developed. Some components that require testing have dependencies that are not yet built or are otherwise unavailable.
You need to test the components.
In the table below, identify where only a shim or a stub can be used in the situation.
Make only one selection in each column.
Answer:
Explanation:
Only 2 values can be selected (1 each column)
QUESTION 93
You are a developer.
Your company has a Microsoft Visual Studio Team Foundation Server (TFS) installation for a project.
The TFS installation uses the Microsoft Solutions Framework (MSF) for Agile Software Development project template.
The developers have standard Contributor permissions, and the Scrum Master has Project Administrator permissions.
The project development team performs time of regression testing of all stories at the end of each release.
Defects are linked to the corresponding story.
The team wants to view all completed user stories for release 1 with related open defects.
This query needs to appear on the home page of the web portal.
You need to create a query that includes the user story title, defect title, and the status of the defect.
Which two actions should you perform? Each correct answer presents part of the solution.
A. Using the Query editor, create a new Flat query named Rl Open Defects.
Set Work Item Type to Defect, and set the State filter to <> Done.
B. Using the Query editor, create a new direct links query named Rl Open Defects that links
user stories by using the iteration filter Under, Release 1, and related Bugs.
Filter the bugs by by State < > Done.
C. Have the Scrum master right-click the query Rl Open Defects, and select add to team
favorites.
D. As a developer, from the Query menu, right-click the query Rl Open Defects, and select add
to team favorites.
Answer: BC
QUESTION 94
You are an automation engineer for your company.
Your Scrum team is defining processes for how your team should deliver products for product owner approval.
Your development team is deciding what the definition of done should be.
You need to contribute a test suite that will confirm each user story’s level of done.
Which test should you perform?
A. Integration
B. Security
C. Performance
D. System
Answer: D
Explanation:
In real exam was UAT value too-here i can not see it … will go with System testing but think is not right-should be UAT.
QUESTION 95
Historically your IT group has done a poor job of reporting issues and successes to key decision makers in a timely manner, due to incomplete or inconsistent application lifecycle management (ALM) practices.
You are implementing Scrum as the process framework for new projects.
The scrum master will publish daily progress reports to the product owner and key stakeholders.
You need to view daily progress and identify if bottlenecks are occurring in the development process.
Which report should you use?
A. Bug Trends
B. Sprint Burndown
C. Cumulative Flow
D. Release Burndown
Answer: C
Explanation:
Kanban teams prefer to use a Cumulative Flow Diagram to visualize work across the entire backlog. Visualizing the backlog in this manner can help to identify bottlenecks in the process. Scrum Teams can also use a Cumulative Flow Diagram.
Professional Scrum Development with Microsoft Visual Studio 2012 p.6
QUESTION 96
Drag and Drop Question
You are a developer for Contoso, Ltd.
The product owner sends an email with a list of requirements that need to be built outyou’re your company’s social media product.
You plan to use the list of requirements to create the Product Backlog.
The development team will break these features into user stories.
You need to create a user story from a user’s perspective in which the user accesses the contact history.
Additionally, you need to document the action the user wants to take and the benefit the user will receive from that action.
Complete the user story. To answer, drag the appropriate component of the user story to the correct target. Each component of the user story may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Answer:
QUESTION 97
You manage several developers who are working on multiple applications.
A business analyst requests an audit trail of work item changes for all prospective releases.
You need to implement a strategy to provide the audit trail.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Enable a check-in policy that requires a successful build prior to check-in.
B. Enable a check-in policy that requires a work item be associated with the check-in.
C. Enable static code analysis during the automated build.
D. Require developers to update the comments field of their tasks with details of any code
changes for their tasks.
E. Request that developers enter the work item ID in the check-in comments for any code
changes they make.
F. Enable the automated build option to associate work items with the build.
Answer: BF
QUESTION 98
You are using Microsoft Test Manager (MTM).
You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template.
Your team has all required permissions to run the reports on the SharePoint project portal.
You need to track the progress on resolving bugs by your team for the past week.
Which Excel report should you run?
A. Bug Trends
B. Bugs by Assignment
C. Run the Team Trend report.
D. Bug Progress
Answer: A
QUESTION 99
Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server. A single build machine is installed with one controller and two agents.
The working directories are configured to use the following working directory:
$(SystemDrive)\Builds\$(BuildAgentId)\$(BuildDefinitionPath).
Your system drive is running out of space and some builds often fail with the following error:
“The specified path, file name, or both are too long. The fully qualified file name must be less than 260 characters, and the directory name must be less than 248 characters.”
You need to meet the following requirements:
– Point the working path to driveD.
– Construct a working directory that can be used to define the shortest unique path for each build agent it is used on.
What should you do?
A. Set the Build Agent working directory path to D:
\BId\$(BuildAqentld)\$(BuildDetinitionPath).
B. Create a system variable named BuildDrive and set its value to D: \.
C. Set the Build Service working directory path to D:
\BId\$(BuildAqentld)\$(BuildDefinitionPath).
D. Set the Team Foundation Build variable named $(BuildDrive) to the value D: \.
Answer: A
QUESTION 100
Drag and Drop Question
Your network environment is configured according to the following table:
You do not have budget to install a new machine.
You need to perform an in-place upgrade of your TFS1 server from TFS 2012.
What should you do? (To answer, move six appropriate actions from list of actions to the answer are and arrange them in the correct order)
Answer:
I understood all of the questions very easily. I scored 96% on my first try. I am definitely going to spread the word amongst friends and colleagues. Keep up the great work.
2016 Microsoft 70-499 exam dumps (All 351 Q&As) from GreatExam:
http://www.greatexam.com/70-499-exam-questions.html [100% Exam Pass Guaranteed!!!]